New warehouse for the Werner Mitsch GmbH

Short-term, flexible and cost-effective

Lagerhalle.jpg

Mitsch-Lagerhalle.jpg

Mitsch.jpg

The family business Werner Mitsch GmbH, founded in 1971, established itself through comprehensive knowledge in the metal sheet forming business. Customers of the Swabian company value the high economic value of the produced goods. That includes samples, individual and serial manufacturing or even the development of entire components and complete solutions. Until now, the medium-sized company has had around 5.000m² (~55.000ft²) of production and warehousing space.

 

Precision and economic reliability is a highly valued factor in the metal sheet forming business and partners and suppliers are held to the same high standards. As Losberger De Boer is a certified ISO 9001-2015 and ISO 14001-2015 company, the specialist in modular space solutions has already worked with Werner Mitsch in the past. In 2019, Mitsch sought to enlarge their warehousing space. To accommodate its long-standing partner, Losberger De Boer set up an industrial industrial hall with 1.000m² (~11.000ft²) of storage area. The new building was equipped with two sectional roller shutters and glass panels on all sides. Thus, on all sides, meaning workers benefit from a maximum amount of daylight. Furthermore, three smoke exhausts were placed in the depot for fire protection reasons. Trapezoidal plates on the walls and within the roof provide additional stability.

 

A fast and reliable solution to production peaks

Whenever the order situation in a company requires a quick reaction on the developments on the market, detachable industrial halls by Losberger De Boer increase productivity. Eventually flexibility is a huge factor for economic success. Thanks to the possibility of a short time assembly and flexible options for extension, the Werner Mitsch GmbH have had their new warehouse handed over with a construction period of only six days.